Frequently asked questions

+
-
We’re opening a new office in 90 days—can you handle end‑to‑end?

Yes. We run parallel tracks: workplace strategy, concept, statutory, MEP coordination, procurement, and site execution. A 13‑week fast‑track Gantt shows dependencies and critical path.

+
-
One owner only—no contractor ping‑pong

You get a Project Lead who owns design, vendors, permits, schedules, and risk. Single Slack/WhatsApp thread + weekly executive summary.

+
-
What do you need from us to start?

Carpet area, floor plate, headcount, neighborhood plan (growth/remote), brand guide, IT/security policies, budget target, move‑in date.

+
-
Can you make a ballpark in 48 hours?

Yes—based on area and spec tier (Essential/Premium/Flagship). Includes fit‑out, MEP, IT/Security, furniture, fees, contingencies.

+
-
We have multiple cities—can you standardize?

We build a Workplace Design Kit (WDK): room sizes, finishes, furniture specs, AV/IT standards, signage, and a governance guide.

+
-
NDA and data security?

NDA-tight workflows, expiring drawing links, and on-prem option for sensitive layouts; visitor/device logs for site.

+
-
Leased shell & core—can you assess viability before we sign?

Yes—test fits, services due diligence, grid/shaft positions, exit stair widths, and lift/BOH adequacy; landlord interface notes included.

+
-
We want minimal downtime—phased build possible?

We plan swing space, night shifts, and dust/noise isolation; critical services sequenced to keep business running.

+
-
Hybrid workforce—how much seat count vs. collaboration?

We model occupancy and peak overlays to set desk ratios, touchdown areas, focus rooms, and collaboration zones.

+
-
Who signs off what?

We set a gate plan: strategy → concept → design dev → GFC → vendor lock → mockups → snag/closure; each gate has owners and deadlines.

+
-
Can you run a quick workplace study?

We do interviews, pulse surveys, utilization mapping, and adjacency matrices; outputs inform zoning and room counts.

+
-
Brand + culture in the plan—not just décor.

We translate values into spatial behaviors: openness, privacy, collaboration, focus. Brand codes map to materials, lighting, and wayfinding.

+
-
Acoustic problems kill productivity—solve up front.

Wall STC specs, ceiling NRC, floor underlays, door seals, white-noise options; test rooms before rollout.

+
-
We need client-facing wow zones without wasting space.

A compact front-of-house with modular furniture and light/media that doubles as townhall space.

+
-
Focus vs. collaboration balance?

We zone by noise, provide phone booths, focus rooms, and multi-purpose huddle spaces; booking rules documented.

+
-
Inclusive design?

Accessible routes, door pulls, braille/tactile signage, height-variable desks, nursing/quiet rooms.

+
-
Wellness and biophilia?

Daylight access, planting strategy, CO₂ monitoring, ergonomic standards, circadian lighting options.

+
-
Food/coffee and informal areas?

Pantry with safe flows, hot/cold zones, odour control, and spill-proof finishes; café seating as informal work.

+
-
Future growth baked in?

Demountable partitions, spare capacity in MEP, and furniture systems that reconfigure.

+
-
Wayfinding and space logic?

Color/graphic coding, landmark features, and clear sightlines so new hires navigate on day one.

+
-
Show us concepts we can feel, not just plans.

Mood boards, materials trays, and quick 3D visualizations; one room mocked up for touch-and-feel before mass ordering.

+
-
Natural light is great—but glare and heat aren’t.

We model sun paths, specify glazing films, blinds, and lighting controls; desk orientations avoid screen glare.

+
-
Finish palette that ages well.

High-traffic ratings, easy-maintenance laminates/tiles, stain-resistant fabrics, and replaceable wear layers.

+
-
Furniture: buy vs. custom?

We mix systems furniture for speed with signature custom pieces where they move the brand needle.

+
-
Phone booths and focus rooms—how to get them right?

Right STC, ventilation, power/USB, and lighting that flatters faces on calls; booking signage included.

+
-
Townhall without a giant dead space?

Retractable seating, mobile AV, and divisible walls so it becomes collaboration space off-event.

+
-
Sustainable materials that still look premium.

Low-VOC paints, FSC timber, recycled tiles, energy-rated appliances; we share EPDs where available.

+
-
Lighting that sells the space on camera.

Layered plan: ambient, task, accent; high CRI, flicker-safe for video calls; tunable in key areas.

+
-
Artwork and brand without plastering logos.

Subtle brand moments in textures, patterns, and wayfinding; a hero wall for storytelling.

+
-
Documentation that contractors can actually build from.

GFC package: plans, RCP, BOQs, details, door/window schedules, and coordination drawings with MEP.

+
-
Can you do design-and-build turnkey?

Yes—single contract for design, procurement, and execution with performance-linked milestones and LDs.

+
-
How do you control quality on site?

Daily checklists, material approvals, mockups, and stage-wise inspections; NCRs resolved before next stage.

+
-
Dust, noise, and neighbors.

Containment, negative pressure zones, silent hours, and polite notices; delivery schedules aligned with the building.

+
-
Fast-track procurement?

Long-lead items (glass, lights, HVAC, furniture) ordered early; alternates pre-approved to avoid delays.

+
-
Safety on site?

HSE plan with toolbox talks, PPE, hot-work permits, and lift plans; audits at milestones.

+
-
Coordination between trades?

Weekly coordination meetings, clash detection, and a single source of truth drawings folder.

+
-
Mockups before mass?

Yes—sample rooms/areas signed off for finishes, acoustics, and lighting before rollout.

+
-
Snagging and handover?

Digital snag lists with photo refs; close-out pack includes as-builts, warranties, manuals, test reports, and training.

+
-
Furniture delivery choreography?

Staggered installation by zone; protection layers to save finished floors and walls.

+
-
Working in an occupied floor?

Night shifts, dust curtains, and safe cordons; MEP shutdowns communicated in advance.

+
-
HVAC sizing and comfort.

Load calculations per headcount + equipment; zoning by use; fresh air per code; low-noise diffusers in focus areas.

+
-
Power and redundancy.

Clean power for IT/AV, UPS rooms with cooling, generator interface; labeled panels and spare ways for growth.

+
-
Low voltage & IT rooms.

Server room sizing, hot/cold aisle logic, access control, CCTV layouts, Wi-Fi heat maps, and cable trays with separation.

+
-
AV that ‘just works’.

Standardized rooms (huddle/VC/board), plug-and-play codecs, acoustic treatment, echo control, and user guides.

+
-
Fire and life safety.

Egress widths, exit signage, emergency lighting, detector/sprinkler layouts, and integration with building systems.

+
-
Statutory approvals (fire/NOC/lift).

We interface with building management and authorities; submissions, inspections, and closure notes handled.

+
-
Acoustic performance in meeting rooms.

Partition specs, door seals, slab-to-slab closures, ceiling breaks; we field-test and tune.

+
-
Water & pantry services.

Supply/return, grease traps where needed, venting, and odor control; spill-proof finishes.

+
-
Security & access control.

Zones, badges/biometric, visitor flows, CCTV coverage; privacy where needed.

+
-
Sustainability/green targets.

Energy targets, low-VOC, waste segregation, and metering; LEED/IGBC pathways if desired.

+
-
Work within ₹X per sq.ft.—still look premium?

We tier specs, prioritize impact zones, and value-engineer back-of-house; you’ll see what’s worth paying for.

+
-
What drives cost the most?

Glazing/partitions, HVAC capacity, custom furniture, specialty lights, stone/veneers, and change orders late in the game.

+
-
Transparent estimates?

Line-item BOQs with alternates; vendor quotes attached; our fee separated.

+
-
Procurement strategy?

Long-lead items early, bulk buys for multi-site projects, and pre-approved alternates to avoid delays.

+
-
Change order control?

Every change logs time/cost impact; we don’t proceed without your sign-off.

+
-
Payment milestones?

Design, GFC, mobilization, mid-progress, pre-handover, and close-out; linked to deliverables.

+
-
Vendor marks-up?

No hidden margins; vendor quotes shared; our management fee is explicit.

+
-
Warranties & spares?

Manufacturer warranties recorded; spares kit for consumables and critical items documented in handover.

+
-
Insurance and liability?

Contractor all-risk during build; public liability where required; handover documentation for your insurers.

+
-
ROI—how do interiors pay back?

Recruitment magnetism, retention, productivity, energy savings, and brand perception; we baseline and measure proxies post-move.

+
-
What does a standard timeline look like for 20,000 sq.ft.?

Strategy 2–3 weeks, design 3–4, approvals 2–4 (parallel), procurement 3–5, build 8–12 — overall 16–24 weeks depending on site.

+
-
Standups and reviews?

Weekly business review with execs; daily site standups; one deck, one thread.

+
-
How do you track risks?

RAID log (Risks, Assumptions, Issues, Dependencies) shared and updated weekly.

+
-
Approvals without delay?

Gate owners + deadlines; if blocked, we escalate with options.

+
-
Documentation control?

Single source of truth, versioned drawings, and transmittal logs; contractors only build from current GFC.

+
-
Reporting cadence?

Weekly KPI roll-up (schedule, cost, safety, quality); monthly deep-dive.

+
-
Decision latency kills projects—how do we avoid?

We flag decisions two gates ahead, pre-read packs sent, and hold fast decision meetings.

+
-
Escalation path?

Clear ladder—PM → Program Lead → Partner in Charge—so issues don’t fester.

+
-
Snag closure before move-in.

Digital snag list with owners and due dates; zero-defect walkthrough before handover.

+
-
Handover and KT?

As-builts, warranties, vendor contacts, maintenance schedules, and a training day for your facility team.

+
-
Support after we move in?

30/60/90-day tune-ups, warranty management, and minor works bank for tweaks as teams settle.

+
-
How do we measure success?

Utilization, satisfaction, acoustic/light comfort, and energy vs. baseline; we share a dashboard.

+
-
Churn—teams keep moving.

Furniture systems and demountable partitions planned for quick reconfiguration; we maintain an as-built model.

+
-
FM manuals and vendor list?

You receive maintenance SOPs, service intervals, and vendor contacts with SLAs.

+
-
Spare parts & finishes.

Attic stock logged and stored; finish schedules list exact SKUs for easy re-orders.

+
-
Energy optimization after 3 months.

We retune lighting/HVAC schedules based on actual occupancy and seasons; quick wins are implemented.

+
-
Adding a new floor/city.

We reuse the WDK and roll forward—same look, faster delivery.

+
-
Brand refresh later—will it break things?

We choose surfaces that accept overlays/graphics so updates don’t require demolition.

+
-
Help desk for little fixes?

Ticketing with severity SLAs; minor works team handles patches without disrupting work.

+
-
When do you consider the project ‘done’?

When the space runs without friction for one full quarter and your team scores it above our threshold on comfort and utility.

image
Logo

We’re the interior design vertical of Garage Collective—the award-winning design house behind campaigns and experiences for brands across India and beyond